Data centre interior at night
Energy-aware workload optimisation

Schedule compute
around the sun.

Gridient optimises when data centres run heavy workloads — based on real-time solar generation, battery charge, and grid carbon cost. Built for Africa, the Middle East, and South Asia.

Footprint5 markets
Solve time< 25 ms
Diesel offset800 gCO₂/kWh
StatusPrivate beta · Q2 2026

Energy is the infrastructure problem.

Compute is now an energy decision. In emerging markets, where grids are thin and diesel is the default, that decision determines whether a data centre is viable at all.

Gridient is the scheduling layer that connects solar forecasts, grid carbon signals, and battery state to the workload queue — so heavy jobs run when energy is cleanest, cheapest, and most available.

The numbers that matter.

Service footprint across five markets. Real-time signals, battery-aware scheduling, and proxy models for grids without coverage.

5markets
Coverage
Kenya · UAE · India · California · Nigeria (proxy)
25ms
Solve time
Median CP-SAT solve for 24h horizon
47%
Diesel reduction
Median across private-beta deployments
2,000kWh/m²
Solar resource
Annual irradiance across our equatorial footprint
Aerial view of a city at night
"The grid that doesn't exist on paper still has to run."
Lagos · 03:14 WATPopulation 21M · Reliable grid < 5 GW

Built for the infrastructure that's actually there.

Gridient is software-first. It runs alongside the BMS, PV controllers, and queue systems you already operate — and it asks for nothing your facility doesn't already produce.

Explore the product